Before we get too far into February, I figured I’d better wrap up our time at Sherry White Ministries. Or at least wrap up Gary’s time (since I was off playing with the sisters!)!! While I don’t know it for an absolute fact, I’m pretty sure there was more thrift shop work for the ladies.
One of the things that Gary and Wiley worked on was moving the electric service at one of the stores so an automatic door opener could be installed. That will eliminate this –
which will be a very good thing!
But back at the farm, the refurbishing of the ‘store’ building was moving right along. Here’s a little progression from earlier in the project –
There’s still lots to do to finish it (and the deck) up, but a whole new crew is there right now making that happen! (Photo creds for the ‘finished’ project go to Gary. Thanks, hon!)
We did manage a group shot before I left –
Pretty sweet group! Hopefully we’ll get to work with these good folks again!
As I sort through my pictures, there maybe be more to add, but hey – I have 25 more days to fill!
Thanks for stopping by –